MACATAWA PARK NEWS

Month: September 2014

Posted  by   on   in 

  September 29, 2014:  The bids were opened September 8th as scheduled. There were three bids received on the pump station, which were clustered together and slightly above cost expectations.  There were two bids received for the water system, which were over cost expectations–and not even close to each other. It is likely that Laketown … Continue reading Water Project Update

Hits: 1,032 views

Posted  by   on   in 

This was gorgeous last Saturday.  A beautiful rainbow to usher in fall at Macatawa.  Looks a bit like a pot of “gold” on the beach I think.  Thank you to John Arendshorst, Jr. (JD) for this great photo.

Hits: 794 views
  • Page :
  • 1